SPCC Plan Development & Inspections

SPCC Plan Development & Inspections

In the industrial and energy sectors, protecting the environment starts with a proactive plan to prevent oil spills from reaching navigable waters. If your facility stores oil in specific quantities, a Spill Prevention, Control, and Countermeasure (SPCC) Plan isn’t just a best practice, it is a federal requirement under 40 CFR 112.

At Grouse Mountain Environmental Consultants, we specialize in SPCC Plan Development and Inspections, ensuring your facility meets all regulatory mandates while protecting the local watershed and your company’s reputation.

Tailored SPCC Plan Development & Preparation

An effective SPCC plan must be as unique as the facility it covers. A “template” approach often misses the critical site-specific details that regulators look for during an audit. We develop comprehensive plans that align with both federal requirements and state-specific spill-prevention regulations.

Our development process includes:

  • Storage Inventory: Accurate documentation of all oil storage containers, including tanks, drums, and oil-filled equipment.

  • Spill Scenarios: Modeling “reasonable to expect” discharge scenarios and outlining specific countermeasure procedures.

  • Professional Engineer (PE) Certification: Ensuring your plan is reviewed and certified by a licensed professional as required for many non-qualified facilities.

Field-Verified: Site Inspections & Infrastructure Validation

A plan is only effective if the infrastructure on the ground supports it. Our team conducts thorough on-site inspections to validate your facility’s physical defenses:

  • Containment Measures: We evaluate the sizing and integrity of your secondary containment (such as berms, dikes, and double-walled tanks) to ensure they can hold the required volume.

  • Infrastructure Integrity: Checking tanks, valves, and line integrity for signs of corrosion, leaks, or structural weakness.

  • Site Drainage: Mapping flow paths to ensure that any potential spill is directed away from sensitive water bodies and into managed containment areas.

Maintaining Compliance: Annual Audits & Reviews

SPCC compliance is an ongoing commitment. Federal law requires plans to be reviewed and updated at least every five years or whenever there is a significant change in facility design or operation.

We provide annual and periodic auditing services to:

  • Document Implementation: Verifying that your staff is following the plan’s inspection and training requirements.

  • Update Records: Ensuring your monthly and annual inspection logs are current and defensible.

  • Identify Gaps: Catching minor maintenance issues before they lead to a spill or a regulatory violation.

Why Professional SPCC Management Matters

The cost of an oil spill (including cleanup, fines, and legal fees) far outweighs the cost of a compliant SPCC program. By partnering with GMEC, you benefit from:

  1. Reduced Liability: Professional site assessments identify risks early, preventing spills before they happen.

  2. Regulatory Confidence: Our plans are built to withstand federal EPA and state-level audits, giving you peace of mind.

  3. Operational Clarity: We provide your team with clear, actionable spill response procedures so everyone knows their role in an emergency.

The GMEC Difference

We combine a deep knowledge of 40 CFR 112 with practical, “boots-on-the-ground” experience in the Rocky Mountain region. Our goal is to create SPCC plans that are easy to follow, technically sound, and fully compliant.

Ready to ensure your project’s compliance?

Contact Grouse Mountain Environmental Consultants today for a consultation.
Learn more about our emergency planning & material storage services.

GET IN TOUCH

You can find us in the office weekdays from 8am-5pm or call anytime.

P: 307.684.2112

Grouse Mountain Headquarters

760 West Fetterman Street
Buffalo, WY 82834

Grouse Mountain New Mexico

3600 Cerrillos Rd, Ste 407
Santa Fe, NM 87507

Send us a message or inquire on your next project.

  • This field is for validation purposes and should be left unchanged.